Wattstor helps Icknield Biogas cut electricity costs by 25% with zero upfront capital

For energy-intensive sites, rising electricity costs and grid constraints can make future growth increasingly difficult. Icknield Biogas, a South Oxfordshire anaerobic digestion site producing enough renewable gas to heat 6,000 homes, faced both: growing electricity demand and a grid connection that limited its ability to expand using conventional renewable solutions. Wattstor’s answer was a fully […]